Phrase: bei
Risultati ricerca
-
-
For crossing the valley of the Anji-Khad in the indian region of Kashmir, close to the himalayan mountains, a cable stayed bridge solution has been adopted with 200 m high single tower and a main span of 290 m. Being the cable-stayed cantilever construction of the main span just completed, when opened it will be the first cable stayed railway bridge ever built in India
-
Tuesday 26 September and Tuesday 10 October at 4.00 PM, Bentley Systems and Strade e Autostrade magazine in a close alliance will talk about digitization in transport industry: three interesting dedicated webinars LA DIGITALIZZAZIONE NEL SETTORE DEI TRASPORTI to attend
-
By NTSG Italy, a single IT platform for the safety and risk management of bridges and viaducts with heterogeneous construction characteristics that guarantees efficiency and easy data management
-
La Commissione Europea ha aggiornato la sua strategia sull’utilizzo dei droni
-
Università degli Studi of Palermo and Ecopneus investigating the recyclability of rubberised asphalt mixtures for road pavements in Italy
-
The Editorial Staff met Julien Moutte and Francois Valois, respectively CTO (Chief Technology Officer) and Vice President of Civil Engineering for Bentley Systems
-
The Marini - Fayat Group asphalt plant
-
The redevelopment of the roman bridge of San Vito, in the Rimini countryside, has recently been completed: the main actor is a Case CX210D crawler excavator
-
Posted in:
La variante di Amatrice
Con una nuova variante, quasi tutta in viadotto, sarà presto possibile by-passare il centro storico di Amatrice liberandolo dal traffico che percorre la S.S. 260 Picente, strada che collega l’Aquila a Rieti e ad Ascoli Piceno