A case study of 3 motorway bridges on the BAB 3 in Germany thanks to BIM - Building Information Modeling
Phrase: rm bridge
Risultati ricerca
-
-
With pressure to deliver engineering projects efficiently and safely, there is growing interest in remote condition monitoring before, during and after construction
-
The first prestressed concrete balanced cantilever bridges date back more than 50 years ago. Their age and the lack of knowledge of long-term concrete behavior have caused many critical issues that are below examined, along with the most frequent measures adopted to overcome them
-
In the construction of the longest suspension bridge in the world, italian skills and products were used to overcome the challenge of effective earthquake protection in areas of high seismicity
-
Nella costruzione del ponte sospeso più lungo al mondo si sono utilizzate competenze e prodotti italiani per vincere la sfida di una efficace protezione dai terremoti in un’area ad alta sismicità
-
The concepts underlying the evaluation of the existing bridges and viaducts are illustrated highlighting the prerequisites and the importance of agile and performance-based regulation
-
The Aquajet Aqua Cutter 710 v robot played a key role in the extraordinary maintenance and waterproofing work of a bridge deck along the motorway access road to the great saint bernard tunnel, which began during the lockdown period for the Covid-19 health emergency. We talked about it with Gian Luca Berger, owner of the Company Costruzioni Stradali B.G.F. Srl commissioned by Sitrasb SpA
-
-
The concepts underlying the evaluation of the existing bridges and viaducts are illustrated highlighting the prerequisites and the importance of agile and performance-based regulation
-
An example of preventive monitoring of a road construction with the use of a triaxial accelerometric sensors’ network with MEMS technology: pilot project in Legnano Municipality